SummitCare, Baulkham Hills – A 270 bed aged care facility that was designed and constructed with a new main switchboard, power factor correction unit, power monitoring system & MATV system. 1600 Amp consumer mains were integrated along with distribution boards, UPS system, submains cabling and all general power, light & emergency lighting through a Cat6 data cabling system.

BREAKDOWN

Client: Richard Crookes Construction
Location: Baulkham Hills, NSW
Value: $2.6m
Completion Date: March 2018